Go to: OVERVIEW (SaveOurCounty)
DETAILS (listener)
PLANNING SCHOOLS ENVIRONMENT EROSION COMMUNICATION
Report corrections+broken links to Webmaster Get updates on local issues
Full calculations at http://listenwell.homestead.com/files/imp3.xls
|
enrollment |
square |
actual |
$/sqft |
value |
cost/ |
1/26/2006
12:54 |
Oct 2005 |
feet |
land |
|
|
seat |
|
|
|
acres |
|
|
|
Total |
7,894 |
|
|
|
$165,742,703
|
$20,996.00 |
Support functions |
|
|
|
|
|
|
Bd of Ed building |
|
16,620 |
|
138 |
$2,293,560 |
$291.00 |
Maintenance Department |
|
6,550 |
|
117 |
$766,350 |
$97.00 |
Transportation Dept, office |
|
1,250 |
|
138 |
$172,500 |
$22.00 |
Transportation Dept, shop |
|
3,750 |
|
117 |
$438,750 |
$56.00 |
Value of buses not reimbursed by state |
|
|
|
|
$443,000 |
$56.00 |
Schools |
|
|
|
|
|
|
School buildings |
|
|
|
|
$132,368,305
|
$16,768.00 |
school land |
|
|
|
|
$8,602,940 |
$1,090.00 |
indoor equipment |
|
|
|
|
$6,223,500 |
$788.00 |
outdoor facilities (athletic, storage, etc.) |
|
|
|
|
$2,562,965 |
$325.00 |
Pavement |
|
|
|
|
$8,966,833 |
$1,136.00 |
Value of portable classrooms |
|
|
|
|
$2,904,000 |
$368.00 |
High schools: |
|
|
|
|
|
|
Jefferson
High main site |
1,646 |
154,775 |
64 |
|
|
|
9th grade site |
655 |
87,264 |
29.93 |
|
|
|
Alternative Learning Center+SoHS |
0 |
4,116 |
0 |
|
|
|
Middle schools: |
|
|
|
|
|
|
Charles Town |
875 |
77,310 |
13.53 |
|
|
|
Harpers Ferry |
466 |
49,645 |
10 |
|
|
|
Shepherdstown |
414 |
64,254 |
8.8 |
|
|
|
Elementary: |
|
|
|
|
|
|
Blue Ridge |
482 |
49,672 |
32.45 |
|
|
|
North Jefferson |
329 |
39,418 |
12 |
|
|
|
Page Jackson |
400 |
58,455 |
12.38 |
|
|
|
Ranson |
385 |
36,495 |
4.29 |
|
|
|
Shepherdstown |
351 |
40,522 |
7.98 |
|
|
|
C W Shipley |
434 |
42,053 |
15 |
|
|
|
South Jefferson |
481 |
44,622 |
15 |
|
|
|
Wright Denny |
376 |
55,316 |
4 |
|
|
|
T A Lowery |
600 |
65,694 |
52 |
|
|
|
|
|
|
|
|
|
|
HS
Total, sch. bldgs |
2,301 |
246,155 |
93.93 |
|
|
|
Middle
Sch. Total, sch. bldgs |
1,755 |
191,209 |
32.33 |
|
|
|
Elem
Total, sch. bldgs |
3,838 |
432,247 |
155.1 |
|
|
|
Total |
7,894 |
869,611 |
281 |
|
|
|
HS
Avg cost |
|
$161 |
$19,000 |
|
|
|
Middle
Avg cost |
|
$164 |
$19,000 |
|
|
|
Elem
Avg Cost |
|
$142 |
$40,000 |
|
|
|
All grades, value |
|
$132,368,305
|
$8,602,940 |
|
|
|
|
|
|
|
|
|
|
|
1 family |
Townhouses |
Duplexes |
Apts. |
Mobiles |
|
K-12 Public Sch.students/home |
|
|
|
|
|
|
AHS (census) survey of outlying DC suburbs '98 |
0.76 |
0.43 |
|
0.23 |
|
|
Greenvest cost report, 11/01 |
0.74 |
0.42 |
|
0.22 |
|
|
Counts
from tax records & schools (WVEIS) |
0.673 |
0.382 |
0.067 |
0.223 |
|
|
Tischler
recommendation |
0.500 |
0.380 |
0.380 |
0.280 |
0.500 |
|
cost/unit,
based on Tischler |
$10,498 |
$7,978 |
$7,978 |
$5,879 |
$10,498 |
|
SBA
adjustment (see table) |
-10% |
-10% |
-10% |
-10% |
-10% |
|
Net
after SBA adjustment |
$9,448 |
$7,180 |
$7,180 |
$5,291 |
$9,448 |
|
|
|
|
|
|
|
|
Bond
Credit |
|
|
|
|
|
|
avg size (sqft) |
2374 |
1693 |
1835 |
1115 |
1268 |
|
credit/sq.ft |
($0.04) |
($0.04) |
($0.04) |
($0.04) |
($0.04) |
|
credit/unit |
($91) |
($68) |
($73) |
($45) |
($51) |
|
Final
capital cost, after SBA+bond credits |
$9,357 |
$7,112 |
$7,107 |
$5,246 |
$9,397 |
|
|
|
|
|
|
|
|
[Note for information: Alternate calculation by square feet] |
|
|
|
|
|
|
The Brown+Horner phone survey showed fewer children, on average, in smaller homes. |
|
|
|
|
|
|
The following figures show these results, for information, although the Committee voted |
|
|
|
|
|
|
not to recommend an adjustment by size of home, to keep the approach simple. |
|
|
|
|
|
|
The average number of children per home rose fairly uniformly up to 1750 square feet. |
|
|
|
|
|
|
Around 1750 square feet, the number of children per home reached a plateau, and did not |
|
|
|
|
|
|
continue to increase with even larger homes. |
|
|
|
|
|
|
Therefore the figures below are broken into |
|
|
|
|
|
|
two sections, below and above 1750 square feet. This approach shows that costs can |
|
|
|
|
|
|
rise per square foot, as calculated in the first group of numbers, until costs reach a ceiling, |
|
|
|
|
|
|
as calculated in the second group of numbers. |
|
|
|
|
|
|
Since the final single family data above, from Tischler, is |
|
|
32% |
|
|
|
lower than Brown+Horner, the students per square foot and per home below are |
|
|
|
|
|
|
reduced by the same percent, for consistency |
|
|
|
|
|
|
|
|
|
|
|
|
|
Average for homes under 1750 sq.ft |
|
|
|
|
|
|
students/1000 sq.ft (Brown+Horner) |
0.47 |
this is avg children per thousand sq.ft,in Brown Horner's survey, in homes<1750 sq.ft. |
|
|
|
|
students/1000 sq.ft, reduced |
0.32 |
reduced to be consistent with Tischler estimate |
|
|
|
|
cost/sq.ft |
$6.72 |
this is the children per sq.ft, times the total capital cost per seat, above: |
|
|
|
$20,996 |
SBA
adjustment |
-10% |
|
|
|
|
|
Net
after SBA adjustment |
$6.05 |
|
|
|
|
|
Net
after bond credit |
$6.01 |
|
|
|
|
|
|
|
|
|
|
|
|
Average for homes 1750 sq.ft or larger |
|
|
|
|
|
|
students/house
(Brown+Horner) |
0.78 |
this is avg children/house in Brown Horner's survey, in homes 1750sq.ft. and larger |
|
|
|
|
students/house, reduced |
0.53 |
reduced to be consistent with Tischler estimate |
|
|
|
|
cost/house |
$11,128 |
this
is the students per house, times the capital cost per house, above |
|
|
|
|
SBA
adjustment |
-10% |
|
|
|
|
|
Net
after SBA adjustment |
$10,015 |
|
|
|
|
|
Net
after bond credit |
$9,924 |
|
|
|
|
|